Episode
Tiger Gold - Fully-Funded Exploration Program Expanding Gold Resources At The Quinchia Project, Building Towards An Updated MRE and PEA
- Podcast
- The KE Report
- Published
- Jun 10, 2026
- Duration seconds
- 1843
- Processing state
not_requested
Actions
POST https://stenobird.com/v1/public/podcasts/the-ke-report-5642261/episodes/tiger-gold-fully-funded-exploration-program-expanding-gold-resources-at-the-quinchia-project-building-towards-an-updated-mre-and-pea/transcription-requests
Idempotently request low-priority transcript generation for this episode.GET https://stenobird.com/podcast/the-ke-report-5642261/tiger-gold-fully-funded-exploration-program-expanding-gold-resources-at-the-quinchia-project-building-towards-an-updated-mre-and-pea.md
Read the agent-friendly Markdown representation of this episode resource.
Summary
[Recorded on Friday June 5th, 2026 before some of their recent news releases] Robert Vallis, President, CEO, and Director of Tiger Gold Corp. (TSXV: TIGR) (OTCQB: TGRGF) (FSE: D150), joins me for a comprehensive introduction to the 2 million ounces of gold resources, rapidly being expanded with a fully-funded exploration program at their Quinchía Gold Project and the Andes Gold Project, located in Colombia's prolific Mid-Cauca belt. Robert outlines both the roughly 2 million gold ounces of resources delineated in all categories, with nearly another 500,000 ounces in historic resources at Dos Quebradas. Multiple Deposits with Significant Upside Potential: 510k oz Au Measured & Indicated Resource (Miraflores) 1,570k oz Au Inferred Resource (Tesorito) 495k ozAu Historical Resource (Dos Quebradas) Robert then highlights how the resources are aggressively being expanded through drilling, and points out a number of the high-priority exploration targets across the Quinchía Gold Project. The Company has completed more than 11,350 metres of drilling in over 35 holes across the project as part of its broader 20,000-metre drill program. The program is ongoing with three diamond drill rigs, including one rig at Tesorito and two at Ceibal; supporting the continued definition and expansion of the project's Mineral Resources. Additionally, the project economics were demonstrated in the 2025 Preliminary Economic Assessment (PEA). The PEA will get another update after all the new drilling from this program gets incorporated. There are parallel workstreams around social licensing, permitting, metallurgy, condemnation drilling, engineering, and other derisking building towards an updated PEA with Ausenco. Tiger Gold is led by a multidisciplinary team of exploration geologists, mine b…