Episode
Dakota Gold - Richmond Hill Exploration Results And Timeline Of Key Development Catalysts For 2026 Through First Pour In 2029
- Podcast
- The KE Report
- Published
- Apr 30, 2026
- Duration seconds
- 1045
- Processing state
not_requested
Actions
POST https://stenobird.com/v1/public/podcasts/the-ke-report-5642261/episodes/dakota-gold-richmond-hill-exploration-results-and-timeline-of-key-development-catalysts-for-2026-through-first-pour-in-2029/transcription-requests
Idempotently request low-priority transcript generation for this episode.GET https://stenobird.com/podcast/the-ke-report-5642261/dakota-gold-richmond-hill-exploration-results-and-timeline-of-key-development-catalysts-for-2026-through-first-pour-in-2029.md
Read the agent-friendly Markdown representation of this episode resource.
Summary
Jack Henris, President and COO, and Shawn Campbell, CFO of Dakota Gold (NYSE American: DC), both join us for an exploration and development update on their Richmond Hill Oxide Heap Leach Gold Project; located in the historic Homestake District of South Dakota, near existing mining infrastructure. We review all the drill results from 2025 and 2026 that will be incorporated into the upcoming resource estimate and the timeline of key development studies that will feed into updated project economics. We also highlight the upcoming drill program at their Maitland Gold Project, which will lead into an eventual resource estimate. We start off reviewing more broad zones of gold mineralization that were announced from in recent drill results at Richmond Hill. Jack highlighted that the results being intercepted in the Northeast Project area contain much higher grades than the average overall resource grade. These results are encouraging their team to consider trade-off studies for the upcoming Pre-Feasibility Study (PFS), to potentially access these higher-grade areas in the first several years of mining. On April 21, the company announced the 2026 Drill Campaign at the Richmond Hill Oxide Heap Leach Gold Project, which consisted of 109 holes with a combination of infill, expansion and geotechnical drilling. The campaign is expected to be completed in the third quarter of this year, with a steady string of assay results anticipated over the balance of the year. Richmond Hill is one of the largest undeveloped oxide gold resources in the United States being advanced by a junior mining company, with over 6 million ounces of gold and over 60 million ounces of silver moving along the pathway of development into heap leach production as soon as 2029. Principle Projects are on Private…