Episode
BP Silver – Fully-Funded Pathway To Road Construction, Channel Sampling, MAG Survey, Phase 2 Drilling, IP Survey, and Phase 3 Drilling At The Cosuño Silver Project
- Podcast
- The KE Report
- Published
- May 16, 2026
- Duration seconds
- 962
- Processing state
not_requested
Actions
POST https://stenobird.com/v1/public/podcasts/the-ke-report-5642261/episodes/bp-silver-fully-funded-pathway-to-road-construction-channel-sampling-mag-survey-phase-2-drilling-ip-survey-and-phase-3-drilling-at-the-cosu-o-silver-project/transcription-requests
Idempotently request low-priority transcript generation for this episode.GET https://stenobird.com/podcast/the-ke-report-5642261/bp-silver-fully-funded-pathway-to-road-construction-channel-sampling-mag-survey-phase-2-drilling-ip-survey-and-phase-3-drilling-at-the-cosu-o-silver-project.md
Read the agent-friendly Markdown representation of this episode resource.
Summary
Tim Shearcroft, CEO and Co-Founder of BP Silver Corp. (TSXV: BPAG), joins me for a review of the fully-funded work programs and pathway to upcoming road construction, channel sampling, MAG Survey, Phase 2 Drilling, IP Survey, and Phase 3 Drilling at the Cosuño Silver Project in Bolivia. We discuss all the levels of exploration data that will collected at each step of all these processes, building upon the successful proof of concept from the initial Phase 1 drill program.The 2026 work program consists of the following key components: 1. Construction of access roads to all principal Cosuño targets. 2. Systematic channel sampling of the principal vein and breccia structures exposed across the property. 3. Completion of a property-wide airborne magnetic ("MAG") survey. 4. A Phase 2 drilling program designed to follow up on the success of the Phase 1 campaign (see news releases dated February 2 and February 27, 2026). The Phase 2 program is budgeted for approximately 2,000 metres of drilling and will focus on: • Testing extensions of high-grade silver intercepts encountered in DH CO-0008 and CO-0009 at Pocañita Chica • Hole # CO-0008 returned 38 m @ 116.39 g/t Ag; including 5 m @ 660.40 g/t Ag; and including 1 m @ 1,655.00 g/t Ag• Hole 3 eCO-0009 returned 58m @ 46.23 g/t Ag; including 6 m @ 147.10 g/t Ag; and including 1 m @ 526.00 g/t Ag.• Initial testing of newly discovered targets by drilling shallow holes ranging from 50 to 100 metres in length. The 1,000-metre-long vein recently discovered at Jalsuri North East is anticipated to be one of these targets. 5. An induced polarization ("IP") geophysical survey over the principal Cosuño targets. 6. Completion of a Phase 3 drilling program. The Phase 3 program will benefit from the integration of geological mapping, channel…