Paris Rooftops - How (Not) To Install A 5G Antenna For An Internet Backup Line
- Published
- Aug 31, 2025
- Duration seconds
- 2068
- Processing state
not_requested- Canonical source
- https://blog.ithorrorstories.eu/episode-5-paris-rooftops/
Actions
POST https://stenobird.com/v1/public/podcasts/it-horror-stories-with-jack-smith-7324626/episodes/paris-rooftops-how-not-to-install-a-5g-antenna-for-an-internet-backup-line/transcription-requests
Idempotently request low-priority transcript generation for this episode.GET https://stenobird.com/podcast/it-horror-stories-with-jack-smith-7324626/paris-rooftops-how-not-to-install-a-5g-antenna-for-an-internet-backup-line.md
Read the agent-friendly Markdown representation of this episode resource.
Summary
Installing a 5G antenna on a rooftop in downtown Paris sounds simple enough - until reality sets in. In this episode, we walk thru the saga of a project that required not one, not two, but multiple site visits before the antenna finally worked as expected. Permits, building access, scheduling delays, unexpected power requirements - each visit brought a new twist, each delay a new story. Was it bureaucracy? Weather? Or just the uniquely French way of doing things? Join us on the rooftops of Paris for a tale of project planning, technical hurdles, and cultural aspects that turns a routine install into a mini-series of its own. Want even more info ? Read our show notes and related blog post related to this episode : https://blog.ithorrorstories.eu/episode-5-paris-rooftops/ All other links and socials : https://links.ithorrorstories.eu/ 00:00 Welcome Back 01:04 Paris Client Challenge 04:40 Paris Commute Fail 08:07 Rooftop Install Mishaps 15:07 Bureaucracy Battles 20:31 Soundtrack Trauma 27:47 Christmas Song Rant 32:57 Lessons Learned 33:38 Disclaimer & Wrap-Up