{"podcast":{"title":"DCD Zero Downtime: The Bi-Weekly Data Center Show","slug":"dcd-zero-downtime-the-bi-weekly-data-center-show-4898114","podcast_index_feed_id":4898114,"rss_url":"https://anchor.fm/s/7d6b7a10/podcast/rss","website_url":"https://www.datacenterdynamics.com/en/podcasts/zero-downtime/","image_url":"https://d3t3ozftmdmh3i.cloudfront.net/production/podcast_uploaded_nologo/20941956/20941956-1642778765559-e0910592f7fb3.jpg","author":"DatacenterDynamics","episode_count":126,"summary":"DCD Zero Downtime is DCD's editorially-led podcast. In each episode, our editorial team will be talking with leading members of the data center and digital infrastructure community, delving deeper into the future of the industry and its major challenges.","last_synced_at":"2026-06-23T06:18:26.932789+00:00","page_url":"https://stenobird.com/podcast/dcd-zero-downtime-the-bi-weekly-data-center-show-4898114"},"episode":{"title":"Episode 105 - Using AI to build AI, with James Stirrat-Ellis of Build","slug":"episode-105-using-ai-to-build-ai-with-james-stirrat-ellis-of-build","published_at":"2026-06-18T16:11:39+00:00","page_url":"https://stenobird.com/podcast/dcd-zero-downtime-the-bi-weekly-data-center-show-4898114/episode-105-using-ai-to-build-ai-with-james-stirrat-ellis-of-build","show_page_url":"https://stenobird.com/podcast/dcd-zero-downtime-the-bi-weekly-data-center-show-4898114","url":"https://podcasters.spotify.com/pod/show/datacenterdynamics/episodes/Episode-105---Using-AI-to-build-AI--with-James-Stirrat-Ellis-of-Build-e3kvijb","audio_url":"https://anchor.fm/s/7d6b7a10/podcast/play/121669675/https%3A%2F%2Fd3ctxlq1ktw2nl.cloudfront.net%2Fstaging%2F2026-5-18%2F426397557-44100-2-3233574ecc0ab.m4a","summary":"Data center site selection is a crucial step in the construction process, and picking the right piece of land can be the difference between a project succeeding and failing. For AI data center developers with money burning a hole in their corporate back pockets, separating the promising propositions from duds is a time-consuming business. Build thinks it can help with an AI-powered system that it says can help sift through potential sites to identify the best parcels of land. In this podcast, CEO James Stirrat-Ellis explains how his company's system combines artificial and human intelligence to speed up projects, and how it has worked with the UK government on its much-vaunted AI Growth Zones.","meta_description":"Data center site selection is a crucial step in the construction process, and picking the right piece of land can be the difference between a project succ…","key_points":[],"chapters":[],"topics":[],"duration_seconds":2252,"processing_state":"not_requested","actions":[{"name":"request_transcript","method":"POST","url":"https://stenobird.com/v1/public/podcasts/dcd-zero-downtime-the-bi-weekly-data-center-show-4898114/episodes/episode-105-using-ai-to-build-ai-with-james-stirrat-ellis-of-build/transcription-requests","description":"Idempotently request low-priority transcript generation for this episode."},{"name":"read_markdown","method":"GET","url":"https://stenobird.com/podcast/dcd-zero-downtime-the-bi-weekly-data-center-show-4898114/episode-105-using-ai-to-build-ai-with-james-stirrat-ellis-of-build.md","description":"Read the agent-friendly Markdown representation of this episode resource."}]}}