{"podcast":{"title":"Calgary Flames News Today | 2 Min News | The Daily News Now!","slug":"calgary-flames-news-today-2-min-news-the-daily-news-now-7528853","podcast_index_feed_id":7528853,"rss_url":"https://feeds.fastcast.ai/calgary-flames-the-daily-news-now.xml","website_url":"https://thednn.ai/","image_url":"https://image.fastcast.ai/podcasts/calgary-flames-the-daily-news-now.jpg","author":"The Daily News Now!","episode_count":73,"summary":"Hosted by Corey with the Story, Calgary Flames News Today delivers fast, focused daily updates on the stories shaping the Flames—from game recaps and player performances to NHL matchups, trades, and roster developments. Designed for quick, on-the-go listening, each episode brings you up to speed in minutes. Produced by AI for speed, consistency, and global scale, the show is part of The Daily News Now network—bringing local sports coverage to every team and keeping fans connected. Calgary Flames News Today is your daily snapshot of Flames hockey. Advertise on DNN: advertise@thednn.ai","last_synced_at":"2026-09-18T12:18:39.440854+00:00","page_url":"https://stenobird.com/podcast/calgary-flames-news-today-2-min-news-the-daily-news-now-7528853"},"episode":{"title":"Scotia Place Hits Final Construction Milestone | Calgary Flames News","slug":"scotia-place-hits-final-construction-milestone-calgary-flames-news","published_at":"2026-07-29T16:18:21+00:00","page_url":"https://stenobird.com/podcast/calgary-flames-news-today-2-min-news-the-daily-news-now-7528853/scotia-place-hits-final-construction-milestone-calgary-flames-news","show_page_url":"https://stenobird.com/podcast/calgary-flames-news-today-2-min-news-the-daily-news-now-7528853","url":"https://sources.thednn.ai/9d8d65550065c069","audio_url":"https://api.fastcast.ai/audio/fd404e7d-aac4-4626-ab9d-9470b24df94e.mp3","summary":"Scotia Place is officially in its final construction year, with major progress across all sides—steel framing rises at the main entrance, angular structures and panels take shape on the northwest and northeast, and the roof is halfway complete on the east side. Workers are preparing the parkade and closing in on the future Esso Community Rink site, all while staying on track for a summer 2027 handover—just in time for the 2027-28 NHL season. Listen in comfort: Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN: advertise@thednn.ai This is an automated, high-level news summary based on public reporting. Report issues to feedback@thednn.ai. View sources & latest updates: https://sources.thednn.ai/9d8d65550065c069","meta_description":"Scotia Place is officially in its final construction year, with major progress across all sides—steel framing rises at the main entrance, angular structur…","key_points":[],"chapters":[],"topics":[],"duration_seconds":99,"processing_state":"not_requested","actions":[{"name":"request_transcript","method":"POST","url":"https://stenobird.com/v1/public/podcasts/calgary-flames-news-today-2-min-news-the-daily-news-now-7528853/episodes/scotia-place-hits-final-construction-milestone-calgary-flames-news/transcription-requests","description":"Idempotently request low-priority transcript generation for this episode."},{"name":"read_markdown","method":"GET","url":"https://stenobird.com/podcast/calgary-flames-news-today-2-min-news-the-daily-news-now-7528853/scotia-place-hits-final-construction-milestone-calgary-flames-news.md","description":"Read the agent-friendly Markdown representation of this episode resource."}]}}