# 74: Taking the plunge - The engineering journey of building a Subsea Cable Page: https://stenobird.com/podcast/meta-tech-podcast-525691/74-taking-the-plunge-the-engineering-journey-of-building-a-subsea-cable Text version: https://stenobird.com/podcast/meta-tech-podcast-525691/74-taking-the-plunge-the-engineering-journey-of-building-a-subsea-cable.md Podcast: [Meta Tech Podcast](https://stenobird.com/podcast/meta-tech-podcast-525691) Published: 2025-04-29T21:43:00+00:00 Episode link: https://insidefacebookmobile.libsyn.com/74-taking-the-plunge-why-meta-is-laying-the-worlds-longest-subsea-cable Audio file: https://traffic.libsyn.com/secure/insidefacebookmobile/mtp74_rc3.mp3?dest-id=697376 Processing state: not_requested JSON: https://stenobird.com/v1/public/podcasts/meta-tech-podcast-525691/episodes/74-taking-the-plunge-the-engineering-journey-of-building-a-subsea-cable Duration seconds: 2389 ## Resource To ensure that everyone has access to resilient, high-speed and low-latency connections to Meta services, no matter where in the world they are, Meta makes large-scale investments into subsea cable infrastructure. The recently announced Project Water worth will, Once complete, reach five major continents and span over 50,000 km (longer than the Earth's circumference), making it the world's longest subsea cable project using the highest-capacity technology available. In this episode, host Pascal talks with another Pascal and his colleague Andy who are involved at every stage of these projects and share the surprising challenges one has to deal with when working on the largest subsea cable project in the world. Got feedback? Send it to us on Threads ( https://threads.net/@metatechpod ), Instagram ( https://instagram.com/metatechpod ) and don't forget to follow our host Pascal ( https://mastodon.social/@passy , https://threads.net/@passy_ ). Fancy working with us? Check out https://www.metacareers.com/ . Links Project Waterworth: https://engineering.fb.com/2025/02/14/connectivity/project-waterworth-ai-subsea-infrastructure/ Timestamps Intro 0:06 Introduction Andy 2:14 Introduction Pascal 3:21 Why do we build our own subsea cable infrastructure? 4:15 Current state of Meta-owned subsea cables 6:20 Project Waterworth 7:40 Why invest in more subsea cables? 9:00 What does a cable look like? 11:14 The process of laying subsea cable 16:39 Unexpected findings on the ocean floor 19:25 Shallow vs deep ocean 21:12 Merging different cable types 24:00 What happens when a cable breaks? 25:04 Memorable challenges 27:42 Cable capacity 29:51 The long history of subsea cables 33:07 What's next? 36:27 Outro 39:02 ## Actions - request_transcript: `POST https://stenobird.com/v1/public/podcasts/meta-tech-podcast-525691/episodes/74-taking-the-plunge-the-engineering-journey-of-building-a-subsea-cable/transcription-requests` — Idempotently request low-priority transcript generation for this episode. - read_markdown: `GET https://stenobird.com/podcast/meta-tech-podcast-525691/74-taking-the-plunge-the-engineering-journey-of-building-a-subsea-cable.md` — Read the agent-friendly Markdown representation of this episode resource. A page view does not enqueue transcription. Agents should invoke `request_transcript` explicitly when they need this episode processed. ## Transcript Full transcripts are not published on public pages unless there is a clear rights basis.